top of page

This Renovation Life

Before

After

 Bathroom 

...progress so far...

IMG_7649
IMG_7650
IMG_7651
IMG_7648
IMG_1720 (3)
IMG_1717
IMG_1713
IMG_1725
IMG_1724 (2)
IMG_1726
IMG_1719
IMG_1721
IMG_1741 (1)
IMG_1740 (1)
IMG_1847
IMG_1850
IMG_1851
IMG_1760
IMG_1875
IMG_1971
IMG_1874
IMG_2011 (5)
IMG_2115 (5)
IMG_2116

The bathroom was absolutely integral to us moving the family in, so back in Dec '16 it was all pistons firing to get the toilet, radiator and water supply plumbed in. And what happened as soon as those things were sorted?

Uhuh. We stopped work in there to get to the next emergency job. 

We do have two bathroom sinks collecting dust under one of the beds somewhere, so we've brushed our teeth in the bath for the last for 12 months. There's a whole shower system collecting dust too somewhere...  but why get the shower plumbed in when you can run up a far bigger water bill bathing FIVE people a day, right? Duh.

All the bathroom currently needs is tiles, lighting and a little concentration. Which is frustrating. It's so nearly there. But then given Jesse's current toilet training escapades (read Potty Mouth here if you dare) finishing off this room might be best left for a few more months.

Here's what 's been going on in there so far...

What's on the ideas list?

Take a look at our

'Bathroom' board on 

Pinterest 

Latest from the renovation blog...

Check back in for progress!

bottom of page